🌿 FSC & ISO Certified 🇪🇺 Made in Europe ⚡ Instant online pricing

Production Process

Guides · Production

Our production process — brief to delivery

Custom packaging production has six disciplined stages. This is how your brief becomes boxes on your filling line — timeline, checkpoints, and quality controls at every step.

The six stages

  • 1. Brief & indicative quote · Day 0–2You send product specs, target volumes, brand references, launch date. Our team returns an indicative quote with 2–3 material options and a recommended finishing direction within 48 hours.
  • 2. Dieline design & proofing · Day 3–7Our dieline engineers build the cutting and folding pattern. We share a 3D preview + flat artwork-ready dieline. You approve the construction before artwork begins.
  • 3. Artwork finalization · Day 8–12Your designer (or ours on request) lays out artwork on the dieline. We proof-check: bleed, print margins, Triman placement, regulatory text, CLP pictograms. ICC-profiled digital proof circulated for sign-off.
  • 4. Physical prototype · Day 13–20A single physical prototype printed on production stock with production finishing. You sign off in hand — foil colour, emboss depth, material feel, lid close. This is the lock point.
  • 5. Production · Day 21–35 (depending on format)Press run, finishing (lamination / foil / emboss / die-cut), assembly (for rigid / magnetic boxes). Our QC runs piece-checks at three stages: post-print, post-finish, post-assembly.
  • 6. Delivery DAP · Day 35–40Palletized, shrink-wrapped, delivered to your filling line, 3PL, or retailer DC. We handle customs, VAT, tracking. You receive boxes ready to fill.

Quality control checkpoints

  • Incoming material inspectionEvery paper / board batch checked for GSM, colour, surface defects before press.
  • Press-start approvalFirst 20 sheets off press reviewed against the approved proof. Colour densitometry + Delta-E against brand spec.
  • Inline finishing checkFoil registration, emboss depth, lamination quality reviewed every 500 sheets.
  • Post-assembly auditFor rigid / magnetic boxes: lid close, hinge action, insert alignment, lining anchoring. 1-in-100 units physically inspected.
  • Pre-shipment checkRandom units pulled from finished pallets. Packed box + product fit (if filling template provided) verified.
  • DocumentationFSC certificates, ink data sheets, production photos, QC log — delivered with every order.

Typical lead times by format

  • Kraft folding carton12–14 days from approved artwork. Reorders: 9 days.
  • GC1 folding carton with window + spot UV14–18 days. Reorders: 11 days.
  • E-commerce mailer (E-flute, direct print)14 days. Reorders: 10 days.
  • Rigid gift box (2mm greyboard wrap)18–22 days. Reorders: 14 days.
  • Magnetic closure box20–24 days. Reorders: 16 days.
  • Retail display (litho-laminated B-flute)22–26 days. Reorders: 18 days.

Rush production

Rush slots available at +15% production surcharge. Lead times compressed by ~30%. We prioritize based on current press schedule — confirm availability before ordering.

Where your boxes are made

Production across our partner network in France, Belgium, and the Czech Republic — all EU-based, all FSC-certified, all ISO 9001 / ISO 14001 audited. Materials sourced from European mills (Fedrigoni, Keaykolour, Sappi, Billerud).

Ready to start?

Send us a brief and we return an indicative quote + 2–3 material recommendations within 48 hours — no commitment, no data capture beyond what we need to quote properly.

Send a brief Read the FAQ

🟡 Demo site — pricing is indicative, no orders will be processed. Final launch pending real payment integration.